Full Depth Reclamation with Asphalt Stabilization

Date: 7/27/2016 8:00 AM - 7/27/2016 2:15 PM

Location: Becket Town Hall
557 Main Street

Becket, Massachusetts

Capacity:

45/46



Overview

This course will review the FDR with Injected Asphalt Stabilization process and its benefits, discuss the importance of lab testing for all reclamation projects, and will look at a variety of treatment options that can be placed over a road that has been reclaimed with stabilization. Additionally, the course will include a site visit to an active FDR with Injected Asphalt Stabilization project.

 

*Date is subject to change due to construction restraints and weather. Attendees will be notified by email if the class is rescheduled.

PLEASE MAKE SURE YOUR EMAIL ADDRESS IS UP TO DATE.

Class size is limited to 30 individuals

Please see the course brochure for more information.

 
Attendees
First Name Affiliation
Bud Town of Dalton
Eric MassDOT District 1
Nathan MassDOT District 1
Justin MassDOT District 1
William MassDOT District 1
Brendon MassDOT
Kyle MassDOT District 1
Amer MassDOT District 1
Henri MassDOT District 1
Kathryn Private Citizen
Susan Places Associates
Wayne Design Consultants, Inc. (Somerville)
Joseph Palmer Paving Corporation
James
Nicolas City of Fitchburg
Mark Town of Palmer DPW
Gerald Berkshire County Highway Association
Larry Town of Orange
David Town of Granby (MA)
Joseph Town of Cummington
Tyrone City of Springfield
Heather Town of Dalton
Kevin City of Leominster
Rich Town of Palmer DPW
Tim Town of Harvard
Connor Town of West Springfield DPW Engineering Division
Paul Town of New Marlborough
Richard Town of Egremont
Andrew Town of Mansfield
Charles Town of New Marlborough
Albert Town of Worthington Highway
Donald Town of Egremont
Rudy Town of Palmer
Derek Town of Otis
Matthew Town of Chesterfield Highway Department
David Town of Sudbury DPW
Steve Town of Andover
Ron Town of Conway
Brian Town of Grafton
William Town of Palmer
Peter Town of Monterey